Interior rough-inPosted by Dale WhitfieldJuly 15, 2026 · 4:30 PMElectrical rough-in wrapped on the main floor and the tubs are set upstairs. Rough inspection is booked for Thursday.Main floor panel and home runsPrimary bath tub setGreat room ceiling wiring
Plumbing rough-inPosted by Dale WhitfieldJuly 13, 2026 · 3:10 PMWater lines are run and the kitchen island rough is in the slab. Everything pressure tested and holding overnight.Kitchen island roughManifold and supply lines
Dry-inPosted by Chris ClayJuly 10, 2026 · 11:40 AMThe house is dried in. Roof is on, windows are set, and the lake wall is all glass now. Come stand in the great room on your next visit.Lake wall glazedStanding seam roofFront elevation
FramingPosted by Dale WhitfieldJuly 4, 2026 · 9:20 AMFraming topped out. The second floor is decked and the great room trusses flew this morning.Great room trussesSecond floor deck